Project Highlights
Miller-Remick provided design and construction admin. services to create a new two-story Outpatient Dental Clinic Center built to allow for two floors of vertical expansion. The project includes a parking lot with handicap accessibility. The Dental Clinic was designed to accommodate treatment rooms, dental labs, offices, bathrooms, lounges, sterile storage and sterile processing, storage rooms, lobby, conference rooms, mechanical spaces, corridors, vestibule, reception, and a panoramic x-ray area. The new building is situated between an existing row of trees and a chapel. A new plaza was built between the Chapel and Dental Clinic to create a buffer and promote a sense of entry. Design elements include:
- Architectural design to include a terra cotta rainscreen entrance, a first floor Patient Treatment Area designed in red brick to match the Chapel, and a second floor Administration Area with a fiber cement panel rainscreen in a wood color and grain. Vertical circulation shall be a tan/brown color brick to match the main hospital.
- Structural design includes foundation systems, superstructure and façade.
- Mechanical design including HVAC systems, VRF air conditioning, outdoor air units, hot water systems, and control systems.
- Electrical design for normal and emergency electrical distribution systems, equipment grounding and wiring devices, lighting, fir alarm systems, telecommunications and low voltage systems.
- Fire protection design for fire and smoke separation, fire sprinkler/standpipe system, water supply, and fire alarm systems.
- Civil design for site utilities, storm sewer/ stormwater management, site grading, site hardscape, and landscaping.
- Plumbing design for potable domestic water service, sanitary waste and vent systems, stormwater and subsurface drainage, propane gas systems, purified water systems, oral evacuation vacuum system, medical vacuum system, nitrogen gas system, medical/dental gas system, and plumbing fixtures.
- We performed construction phase services including on-site visits with written documentation of construction meetings and site observations, along with as-built drawings and a final punch list. We reviewed all requested shop drawings and related submittals, along with responded to all contractor RFI’s in a timely manner.
Phase 2 – Dental Building Build Out
This project entailed interior renovations and an exterior vestibule and canopy addition to the existing Dental Clinic Building. The current facility is a 2-story building (with small basement 450 sf), 18,830 SF building proposing 3,400 square feet of renovations throughout the 1st and 2nd floors. The scope includes all architectural and engineering construction modifications necessary to provide services for the Dental Clinic. Phase 2 included dental treatment shell space, shared-office shell space, panoramic x-ray room, vestibule with canopy, elevators, and storage space.