Project Highlights
Miller-Remick was a subconsultant on a team that transformed the 150 acre Canandaigua VA Medical Campus to better service the medical needs of today’s veterans. The project consisted of renovation of six existing buildings and design of 13 new buildings for various purposes that included, a chiller plant, community living center (CLC), domiciliary, outpatient clinic, loading dock and water tower with new site distribution.
Design includes a new CLC with ten cottages and 120 beds; renovation for a 50-bed domiciliary facility; renovation of four buildings for a modern, consolidated outpatient clinic; and upgrading the campus utility infrastructure, tunnels & walkways, including sanitary, storm, water, steam, electrical and chilled water systems.
As subcontractor to SWBR, M-R provided Electrical and Fire Safety Systems including surveillance cameras, panic buttons (personal duress systems), fire alarm, physical access control systems, telecom systems for multiple new and existing buildings. This was considered a major renovation project by Federal standards that required the USACE to oversee the two phased projects to completion.










