Project Highlights
Miller-Remick provided professional design and construction administration services to renovate existing SPS spaces to create a new Sterilization, Processing, and Distribution Space (SPS) to meet the growing needs of the medical center. The facility had functional SPS that will remain unaffected and operational during this project. The design included the following elements:
- Comprehensive site investigations covering seismic, structural, architectural, mechanical, plumbing, fire protection, electrical, telecommunications, and environmental hazards (including lead and ACM).
- Integration of new features such as a cart washer, sterile cooling zone, and HAC closets for clean/dirty separation.
- Selected non-institutional, durable finishes to support long-term maintenance.
- Design for all impacted systems: HVAC, plumbing, telecom, electrical (normal/emergency), lighting, data, and signage, to provide new components or extended as deemed appropriate to suit the requirements in compliance with all applicable codes and standards.
- Our team will coordinate closely with VA on equipment specifications, ensuring architectural, structural, mechanical, and electrical compatibility.
- Modification of fire suppression and fire alarm/mass notification systems.
- Structural design to verify the roof can support the duct work, rooftop exhaust fans, and renovation of existing openings.
- Construction Period Services including review of submittals, shop drawings, RFIs, product data, and modifications; overseeing third-party asbestos monitoring and commissioning activities; production of record drawings based on contractor red-line as-builts.







